Skip to content

Version Packages - #102

Merged
Blackman99 merged 1 commit into
mainfrom
changeset-release/main
Sep 14, 2026
Merged

Blackman99 merged 1 commit into
mainfrom
changeset-release/main

Conversation

@github-actions

@github-actions github-actions Bot commented Sep 13, 2026

Copy link
Copy Markdown
Contributor

This PR was opened by the Changesets release GitHub action. When you're ready to do a release, you can merge this and the packages will be published to npm automatically. If you're not ready to do a release yet, that's fine, whenever you add more changesets to main, this PR will be updated.

Releases

codsh-bundle@0.23.0

Minor Changes

  • 0c2f9e3: Mission Contract control plane for /ship: sealed contract at Confirm, write-tier restore, Active Ticket land packs, Alignment Gate, Drift Detector, and evidence-based Verifier.
  • 2f0ed56: Run wayfinder before the /ship grill interview. Keep decision mapping separate from implementation, persist unfinished maps through wayfinding/grilling states, and hand confirmed routes to grill in a fresh turn. Show the wayfinder stage in the status row, preserve map references for spec synthesis, and keep existing specs resumable at their original phase.

Patch Changes

  • 3defc71: chore: sync @deepseek-ai/dsh-* (and co-released cordis packages) to 0.1.5-rc.2
  • Integrate Mission Contract alignment and evidence checks with original-requirement snapshots and single-ticket coordination. Keep drift as a blocking condition rather than silently restoring changed requirements, apply action mapping to the same dependency-selected ticket, and require recorded acceptance evidence before final delivery. Preserve ticket progress until final verification instead of reconciling it after every write.
  • 2f0ed56: Bind one /ship spec for phase, goal, UI, and completion; several unfinished specs open a selector, and a pipe refuses the ambiguity. Keep the user's original wording in Original Requirement, distinct from Main Track. Persist that wording plus sealed Main Track and acceptance criteria, when present at gate 1, in an adjacent runner-owned snapshot checked at phase boundaries and on resume. Delegate investigation, research, ticket implementation, and review to fresh-context subagents; the parent keeps questions, gates, and final proofs. All plans use one parent-coordinated ticket per turn, with runner-owned goal, plan and progress checks before the next dispatch. Final verification is separate; unresolved blockers, no-progress turns and a turn budget stop automatic continuation. Ralph remains available as a separate explicit tool, not an automatic ship branch.
  • 2f0ed56: Fix consecutive question revisions so the transcript records each final answer once. Support multi-select in ship grill cards and restore all selections when revisiting. Preserve write-in drafts, separate navigation from custom answers, stop remaining questions on dismissal or cancellation, and fix question context, focus, cursor, navigation hints, and option classification.
  • 2f0ed56: Keep context usage, window capacity, and the remaining percentage visible in the status row during normal usage and after resuming a session. Preserve low-capacity warnings, show unknown measurements explicitly, and keep context ahead of the workspace and model when fitting narrow terminals.

codsh-cli@0.23.0

Patch Changes

  • 3defc71: chore: sync @deepseek-ai/dsh-* (and co-released cordis packages) to 0.1.5-rc.2
  • 2f0ed56: Bind one /ship spec for phase, goal, UI, and completion; several unfinished specs open a selector, and a pipe refuses the ambiguity. Keep the user's original wording in Original Requirement, distinct from Main Track. Persist that wording plus sealed Main Track and acceptance criteria, when present at gate 1, in an adjacent runner-owned snapshot checked at phase boundaries and on resume. Delegate investigation, research, ticket implementation, and review to fresh-context subagents; the parent keeps questions, gates, and final proofs. All plans use one parent-coordinated ticket per turn, with runner-owned goal, plan and progress checks before the next dispatch. Final verification is separate; unresolved blockers, no-progress turns and a turn budget stop automatic continuation. Ralph remains available as a separate explicit tool, not an automatic ship branch.

@github-actions
github-actions Bot force-pushed the changeset-release/main branch 2 times, most recently from 55261bf to eae6fd3 Compare September 14, 2026 00:46
@github-actions
github-actions Bot force-pushed the changeset-release/main branch from eae6fd3 to d0c45b5 Compare September 14, 2026 01:58
@Blackman99
Blackman99 merged commit ec67498 into main Sep 14, 2026
2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant