Skip to content

Implementation of different calendar function without leap years #1

Description

@TobiasKAndersen

A scenario simulation with GOTM could be done by choosing forcing from one or several years as a period to repeat several times, thereby creating a longer scenario period built upon actual forcing data. But if the repeat period is not 4 years long, the scenario simulation will run into a problem with leaps years.
Therefore, the option of GOTM being able to run on a calendar without leap years would enable to run scenario simulations build upon repeating actual forcing data much more smoothly.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions