docs(ignition): acceleration ruling — front-load count, parallel Phase IV, flip pre-build#939
Conversation
…el Phase IV, pre-build flip Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
|
Claude finished @kyle-sexton's task in 1m 9s —— View job PR Review #939
SummaryPure documentation change — 16 lines appended to the Phase 4 blockquote in What the addition recordsThe note records an operator ruling (2026-07-22) and same-day watch activity. The three sanctioned levers are:
Activity record: drain PRs #23/#24/#26 + Dependabot #25 merged; scratch#27–#31 seeded; predicate at completions=6, gate 100%, reverts 0. Review findingsEvidence integrity — well-handled. The ruling explicitly preserves both calendar gates ("shortening them would gut the evidence's meaning") and the no-fabricated-seeds constraint. The Dependabot PR #25 exclusion ("never count as drain evidence") is a good explicit record. The Minor: roman vs arabic numeral inconsistency. "Phase III flip machinery" terminology. Format and conventions. The addition follows the established blockquote / dated-status-note pattern used throughout Phase 4. Branch name ( VerdictLGTM. The two nits (numeral consistency, flip-machinery layer labeling) are cosmetic and don't affect correctness. No blockers. |
Dated Phase-4 note: operator ruling (2026-07-22) to move at maximum speed within the predicate's intent. Calendar gates stay binding; sanctioned levers are front-loaded seeding (genuine items only), parallel Phase IV ignition (gate already met), and pre-built Phase III flip machinery. Records same-day watch activity: drain PRs #23/#24/#26 + Dependabot #25 merged in kyle-sexton/autonomy-demo-scratch, queue reseeded (scratch#27–#31), predicate completions=6.
Related
🤖 Generated with Claude Code