docs(ignition): acceleration ruling — front-load count, parallel Phase IV, flip pre-build#939

Merged
kyle-sexton merged 1 commit into
mainfrom
docs/ignition-accel-note
Jul 22, 2026
Merged

docs(ignition): acceleration ruling — front-load count, parallel Phase IV, flip pre-build#939
kyle-sexton merged 1 commit into
mainfrom
docs/ignition-accel-note

Conversation

@kyle-sexton

Copy link
Copy Markdown
Contributor

Dated Phase-4 note: operator ruling (2026-07-22) to move at maximum speed within the predicate's intent. Calendar gates stay binding; sanctioned levers are front-loaded seeding (genuine items only), parallel Phase IV ignition (gate already met), and pre-built Phase III flip machinery. Records same-day watch activity: drain PRs #23/#24/#26 + Dependabot #25 merged in kyle-sexton/autonomy-demo-scratch, queue reseeded (scratch#27–#31), predicate completions=6.

Related

🤖 Generated with Claude Code

…el Phase IV, pre-build flip

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
@claude

claude Bot commented Jul 22, 2026

Copy link
Copy Markdown

Claude finished @kyle-sexton's task in 1m 9s —— View job


PR Review #939

  • Gather context and read changed files
  • Review changes for correctness and alignment with guidelines
  • Post review findings

Summary

Pure documentation change — 16 lines appended to the Phase 4 blockquote in docs/topics/autonomy-ignition/PLAN.md. No code, no plugin manifests, no schema changes. No security or correctness concerns.

What the addition records

The note records an operator ruling (2026-07-22) and same-day watch activity. The three sanctioned levers are:

  1. Front-load completion count — seed genuine C2 items fast; fabricated seeds explicitly forbidden
  2. Parallel Phase IV ignition — gate (Phase I demonstrable) already met 2026-07-21
  3. Pre-build flip machinery — promotion PR draft so eligibility date (~2026-08-04) is ratify-and-merge, not a build day

Activity record: drain PRs #23/#24/#26 + Dependabot #25 merged; scratch#27–#31 seeded; predicate at completions=6, gate 100%, reverts 0.

Review findings

Evidence integrity — well-handled. The ruling explicitly preserves both calendar gates ("shortening them would gut the evidence's meaning") and the no-fabricated-seeds constraint. The Dependabot PR #25 exclusion ("never count as drain evidence") is a good explicit record. The Refs vs Closes linkage defect on #24 is honestly captured.

Minor: roman vs arabic numeral inconsistency.
The ruling uses "Phase IV" (roman) while the rest of this document uses "Phase 4" (arabic). Cosmetic only — no ambiguity in context — but worth noting as a future consistency nit.
Line 247: (2) **ignite Phase IV in parallel**

"Phase III flip machinery" terminology.
The ruling body references "Phase III flip machinery" (roman, upper) which refers to the roadmap-layer C2 promotion machinery, not Phase 3 of this local plan (which is already DONE). This is clear in context but a reader skimming only this section might briefly conflate the two layers.
Line 251: (3) **pre-build the Phase III flip machinery**

Format and conventions. The addition follows the established blockquote / dated-status-note pattern used throughout Phase 4. Branch name (docs/ignition-accel-note) and PR title (docs(ignition): ...) conform to the <type>/<description> and Conventional Commits requirements in CLAUDE.md. No plugin-manifest or schema changes, so the fresh-docs mandate doesn't apply here.

Verdict

LGTM. The two nits (numeral consistency, flip-machinery layer labeling) are cosmetic and don't affect correctness. No blockers.

@kyle-sexton
kyle-sexton merged commit 83f9294 into main Jul 22, 2026
25 checks passed
@kyle-sexton
kyle-sexton deleted the docs/ignition-accel-note branch July 22, 2026 03:59
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant