Goal
Track Cortex V2 (memory control plane) per docs/CORTEX_V2.md / plan Cortex V2 Roadmap.
Thesis: Memory agents can trust before they act.
Signature trio: Reliability Gate · Evidence Graph · Memory Firewall
Phase 0
P0 — Must Have
P1 — Differentiators
P2 — Intelligence
Related existing backlog (not V2-specific)
Suggested order
- Phase 0 audit
- Data foundations → Evidence → Temporal
- Reliability Gate → CortexBench signature
- P1 Firewall / Procedures / Outcomes
- P2 Abstention / Gaps
Non-goals
No new vector DB, no Kafka/Neo4j replacement, no connector sprawl, no frontend redesign before reliability features.
Goal
Track Cortex V2 (memory control plane) per
docs/CORTEX_V2.md/ plan Cortex V2 Roadmap.Thesis: Memory agents can trust before they act.
Signature trio: Reliability Gate · Evidence Graph · Memory Firewall
Phase 0
P0 — Must Have
/reliability/evaluate+cortex_evaluatecortex_explain_memoryP1 — Differentiators
P2 — Intelligence
Related existing backlog (not V2-specific)
Suggested order
Non-goals
No new vector DB, no Kafka/Neo4j replacement, no connector sprawl, no frontend redesign before reliability features.