Skip to content

Fix stale Pages release-note evidence for v1.6.28 - #171

Merged
masarray merged 1 commit into
mainfrom
cleanup/sync-release-notes-1.6.28
Aug 14, 2026
Merged

masarray merged 1 commit into
mainfrom
cleanup/sync-release-notes-1.6.28

Conversation

@masarray

Copy link
Copy Markdown
Owner

Fixes the concrete blocker behind Pages Health issue #160.

Production-health run #188 proved that the public site remained at v1.6.23 because pages.yml failed before build/deploy: release-evidence/published.json and landing/latest.json correctly describe stable v1.6.28, while landing/release-notes.json was still v1.6.23.

This PR synchronizes release-notes to the already-published v1.6.28 release scope from merged release PR #168 and the immutable GitHub release evidence:

  • published release target c8db018b97503cfe09e7d498517d0f5e43e98c8e;
  • installer SHA-256 e58a1a6f7640a8563c3b6413daf5701a5e81e3dd67d09c0e8a697c94792a36f2;
  • portable SHA-256 b364b2c23b2017afe26058ef918acc4f91793dccf6e6a5a1853ff5fb10b55a00;
  • release scope: restored first-run launchers/FAT evidence priority, UTC-Time decoded precision, live MMXU/MMXN measurement fixes, and corrected timestamp-evidence wording.

No application/protocol code is changed. After CI and merge, pages.yml will be rerun and production attestation must pass before issue #160 is closed.

@masarray
masarray merged commit 9e06475 into main Aug 14, 2026
12 checks passed
@masarray masarray mentioned this pull request Aug 14, 2026
masarray added a commit that referenced this pull request Sep 11, 2026
Field-accepted COMTRADE workstation integration from the P1D stack through P1D.7.

Includes synchronized Time Signals, Phasor, Harmonics, native six-loop Locus, RMS/PRI-SEC presentation, cursor measurements, first-click fault-record reliability, deterministic analog-before-digital ordering, Clear/Auto state authority, retained/screen-space waveform rendering, synchronous cursor transforms, bounded latest-wins analysis/readout scheduling, and bridge-only packaging.

Exact merge-prep head passed Build ARSAS #2571, SV #1576, COMTRADE integration #171, and Windows Installer #893 against current main. The production AGENTS.md from main is preserved. ArdIrec PR #41 was merged first and the ARSAS lock remains pinned to the exact field-tested bridge commit. FAT workstation files/branches are intentionally untouched and remain under their independent field gate.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant