Skip to content

P1D.2A: validate latest ArdIrec investigation bridge from .NET - #297

Closed
masarray wants to merge 4 commits into
feat/p1d-synchronized-disturbance-workspacefrom
feat/p1d2a-ardirec-bridge-consumer
Closed

masarray wants to merge 4 commits into
feat/p1d-synchronized-disturbance-workspacefrom
feat/p1d2a-ardirec-bridge-consumer

Conversation

@masarray

Copy link
Copy Markdown
Owner

Stacked on ARSAS PR #295. This is a consumer-proof slice only; it does not change COMTRADE UX yet.

It temporarily pins the exact P1D.2A ArdIrec bridge head built on top of open ArdIrec PR #30 and adds managed integration coverage for the new investigation-context exports:

  • capability probing;
  • analog role/phase semantics;
  • Primary/Secondary scaling metadata;
  • cursor instantaneous + trailing one-cycle true RMS;
  • normal-state-aware digital state;
  • nearest digital-edge snap.

The test loads the exact ardirec_bridge.dll produced by the pinned engine in the integration/installer lanes and calls the C ABI directly, so P/Invoke struct layout/function signatures are proven before P1D.2B wires global C1/C2 and the measurement panel.

Do not merge this temporary pin. After ArdIrec P1D.2A lands, replace the lock with the merged main SHA and fold the managed wrapper changes into P1D.2B.

Copy link
Copy Markdown
Owner Author

Superseded by the field-accepted consolidated COMTRADE integration in PR #300, squash-merged to main as c3e2ac3ef6e6a3a49f47c5155a0ba4a7c00bcb6b. The native dependency was also landed first via ArdIrec PR #41. Closing this temporary stacked consumer PR without a separate merge avoids duplicate history.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant